Protection & preparation
- Working-area protection
- Planned access and waste removal
- Site setup and daily management
This is our typical specification guide. Your signed quotation, drawings, engineering design and contract define the exact project scope.
Structural sizes and insulation build-ups are never copied from a generic list. They are confirmed for the actual house, design and applicable regulations.
Our turnkey guide adds approximately €300/m² ex VAT to the builder's finish, with the final package and allowances stated in your quotation.
Your handover pack is planned to bring together the signed contract, scope of works, engineer's certificate, electrical certificate, warranty terms and final inspection record.
See the handover pack