The design must work as a system

The structure, escape strategy, stairs, insulation, ventilation, electrics and room use affect one another. This is why a generic material list is not enough.

Key areas to assess

  • Structure: new floor loads, roof support, openings and connections.
  • Fire safety: alarms, protected escape route, doors, linings and roof access.
  • Stairs and guarding: rise, going, pitch, headroom, landings and balustrades.
  • Energy and moisture: insulation, airtightness, ventilation and condensation risk.
  • Electrical work: competent installation, testing and certification.

Certification and handover

Your project documents should match the actual scope and the professionals appointed. AtticHaus plans an engineer's structural certificate and electrical certificate into the applicable handover pack, alongside the contract, scope and warranty information.

General guidance only. The correct planning, design, engineering and compliance position must be confirmed for your house and proposed works.