Ask for six things in writing
- The exact scope, drawings, finishes, allowances and exclusions.
- Who is responsible for engineering, planning checks and regulated trades.
- Current insurance appropriate to the work.
- A payment schedule tied to clear milestones.
- Which certificates and records arrive at handover.
- Warranty duration, coverage, exclusions and claim process.
Test the quotation
Confirm VAT, stairs, rooflights, dormer, insulation, plastering, electrics, plumbing, decorating, flooring, waste and professional fees. If two quotes use different assumptions, they are not comparable.
Check the handover before the build
Ask to see the proposed contents of the handover pack. AtticHaus sets out the contract, scope, engineer's certificate, electrical certificate, warranty information and snag record in the Project Passport structure.
Look for calm, specific answers
A good contractor should be comfortable explaining what is confirmed, what is provisional and what still needs professional assessment.
General guidance only. The correct planning, design, engineering and compliance position must be confirmed for your house and proposed works.